Across 12 qualifying US industrial recommendations, the median projected simple payback was 2.352 years. The middle half ran from 1.387 to 3.634 years. Those figures describe the assessed proposals for burning waste paper for heat, in fiscal years 1982 to 2014.

The scope of the plant change

Identify the hot and cold sides, the hours at useful temperature and the measured production output. Include periods of standby and cleaning. The gross heat flow and the amount a receiving process can accept are separate quantities in a local estimate.

A recommendation you can reproduce

Recommendation ST001704 in US fiscal year 1985 pairs US$25,200 of implementation cost with US$10,055 in estimated annual net savings. Dividing the first figure by the second gives 2.506 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$33,662 and the median annual saving was US$17,087. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for burning waste paper for heat. Lower quartile 1.387, median 2.352 and upper quartile 3.634 years.
Estimated payback for burning waste paper for heat. Lower quartile 1.387, median 2.352 and upper quartile 3.634 years. Figure by Industry Applied.

What the records can support

The source lists 13 recommendations under assessment code 3.6121. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 12 comparable records, 0 carry the implemented flag and 12 the non-implemented flag. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 9 qualifying records had a median of 2.198 years. For fiscal years 2000–2014, 3 qualifying records had a median of 3.623 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

UM031101

2006

27325

109604

0.2493066

ST001001

1984

25000

17516

1.427266

ST001704

1985

25200

10055

2.506216

UM021101

2002

92625

25568

3.622692

UF021308

1998

90000

18145

4.960044

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 3.342 years. At full forecast savings and a 20% higher installed cost, it would give 3.007 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.