Across 117 qualifying US industrial recommendations, the median projected simple payback was 1.347 years. The middle half ran from 0.7418 to 2.112 years. Those figures describe the assessed proposals for burning waste oil for heat, in fiscal years 1986 to 2021.

The scope of the plant change

Identify the hot and cold sides, the hours at useful temperature and the measured production output. Include periods of standby and cleaning. The gross heat flow and the amount a receiving process can accept are separate quantities in a local estimate.

A recommendation you can reproduce

Recommendation OD007306 in US fiscal year 1996 pairs US$2,920 of implementation cost with US$2,167 in estimated annual net savings. Dividing the first figure by the second gives 1.347 years. This record was selected by proximity to the median payback, with the more recent assessment preferred when ratios tie.

The median implementation cost was US$3,490 and the median annual saving was US$2,633. Those two medians can come from different facilities. To obtain the payback distribution, divide cost by annual savings within each recommendation and take percentiles of the resulting years. Zero-cost measures remain in the calculation. The table selects actual records at five ordered positions, so its rounded examples can differ slightly from interpolated percentiles.

Estimated payback for burning waste oil for heat. Lower quartile 0.7418, median 1.347 and upper quartile 2.112 years.
Estimated payback for burning waste oil for heat. Lower quartile 0.7418, median 1.347 and upper quartile 2.112 years. Figure by Industry Applied.

What the records can support

The source lists 123 recommendations under assessment code 3.6124. The analysis retains records with a reported fiscal year, a non-negative implementation cost and positive net annual monetary savings. It sums the reported primary, secondary, tertiary and quaternary dollar savings, preserving recorded costs or offsets. A missing savings field contributes nothing only when at least one resource has a recorded value.

Of the 117 comparable records, 11 carry the implemented flag and 99 the non-implemented flag. The remaining 7 have another or unreported status. These are administrative outcomes. They do not establish the saving subsequently measured at an individual plant.

How the assessment mix affects the comparison

For fiscal years 1980–1999, 52 qualifying records had a median of 1.671 years. For fiscal years 2000–2014, 61 qualifying records had a median of 1.041 years. For fiscal years 2015–2026, 4 qualifying records had a median of 0.7426 years. Grouping by year changes the mix of facilities and proposals. The medians are descriptive, and the database does not establish a causal trend over time.

Worked data

Recommendation ID

US fiscal year

Implementation cost (USD)

Estimated annual net saving (USD)

Recalculated payback (years)

UL013905

1995

800

25000

0.032

WV028008

2003

3500

4718

0.7418398

OD007306

1996

2920

2167

1.347485

WV030109

2004

3800

1799

2.112285

ME023809

1998

21500

2633

8.165591

Using the evidence in an Australian project

For the worked record, delivering only three quarters of its estimated annual saving would give 1.797 years. At full forecast savings and a 20% higher installed cost, it would give 1.617 years. These are sensitivity calculations using the same original proposal. A local business case needs quotations and a current Australian tariff or material price.

Run the local comparison over the same production duty in both cases. Keep a separate column for incentives, scheduled replacement and avoided maintenance so that the engineering change can be evaluated at both full and incremental cost.

Sources and calculation files

The assessment-code results and the US Industrial Training and Assessment Centers database download contain the original recommendations. Dollar amounts are nominal US dollars for the assessment year. The Australian Government equipment guides provide local context. Download the worked records as CSV.