Five sieve masses, one grading curve: which column is percent passing?

Rebuild a 1 kg aggregate grading result from mass retained on each sieve. Cumulative retention is the step that prevents a reversed grading curve.

Industry Applied Editorial Published 2 min read

Laboratory aggregate sieves and size-separated material. AI-generated editorial illustration.
AI-generated editorial illustration by Industry Applied · Industry Applied editorial artwork

Percent passing at a sieve is the fraction that got through that sieve. Calculate the cumulative mass retained on that sieve and on all coarser sieves, divide by the test mass, and subtract from 100%. Using only the material lying on the individual sieve gives the wrong curve.

Follow a one-kilogram test portion

For illustration, 120 g stays on a 9.5 mm sieve, 280 g on 4.75 mm, 350 g on 2.36 mm and 200 g on 1.18 mm. The pan collects 50 g. The recovered materials total 1,000 g. At 4.75 mm the cumulative retained mass is 120 + 280 = 400 g, so 60% passes. At 2.36 mm cumulative retained reaches 750 g and only 25% passes.

The openings are shown from coarse to fine. The passing percentage declines as more of the original 1,000 g is retained.
Figure 1. The openings are shown from coarse to fine. The passing percentage declines as more of the original 1,000 g is retained. Original figure by Industry Applied Editorial. Illustrative data.

Worked data

Sieve opening

Individual retained mass (g)

Passing (%)

9.5 mm

120

88

4.75 mm

280

60

2.36 mm

350

25

1.18 mm

200

5

Download the figures in this worked example (CSV)

The pan is a useful independent check

The last passing value is 5%. In this example, the measured pan contains 50 g, which is also 5% of the original 1,000 g. If the two do not agree, check transcription, zeroing and sample loss. Re-normalising every column to the recovered total can hide an unexpectedly large mass discrepancy, so retain the original test mass.

Iowa DOT’s IM 302 is a published worked-method reference for gradation. Australian and New Zealand contracts may specify a different test method, sieve sizes, preparation or reporting precision. This calculation explains the arithmetic, not acceptance against a particular road specification. Use the designated method and size envelope when deciding whether a delivered aggregate meets the job requirement.