The tur.P series gives a net 4.6637 kWh over 172,800 s when the saved power samples are joined by straight lines. The highest recorded power is 1,896.4 W. The sign follows the model’s measurement boundary. It matters when a connector can exchange energy in either direction.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named WindTurbine. The source file places it under Electrical, AC, One Phase, Sources. We used the 101 stored values for tur.P over the interval 0 to 172,800 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name weaDat (Reader TMY3), weaBus (Bus), res (Resistive), sou (Grid). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
At 115,776 s, tur.P reads 1,479.5 W and sen.V reads 121.098 V. Across the run, the second channel ranges from 120 V to 121.404 V. Compare the timing of changes on the two traces. A numerical difference between these channels has no demonstrated physical meaning without matching quantity definitions and units.

Reproduce the calculation
Integrating the signed tur.P samples by the trapezoidal rule gives 4.664 kWh over 172,800 seconds. For each pair, average the two powers in watts and multiply by the interval in seconds. Sum the watt-seconds and divide by 3,600,000. This value refers to the selected simulation connector and should be assigned to a physical load only after confirming the boundary and sign.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | tur.P (W) | sen.V (V) |
|---|---|---|
0 | 0 | 120 |
34560 | 0 | 120 |
69120 | 0 | 120 |
103680 | 0 | 120 |
114048 | 853.7353 | 120.6365 |
115776 | 1479.478 | 121.0984 |
117504 | 1896.356 | 121.4039 |
138240 | 0 | 120 |
172800 | 0 | 120 |
What to check on site
Keep voltage, current, real power and energy distinct. Establish the reference direction at the measurement terminal before interpreting a sign change as import or export. Compare the same load boundary and duration in site data and the simulation.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Units in the source model
The component declarations identify the scale of the exported variables. In this run, sen.V uses V. Keep the exact channel name and unit together when exporting data to a historian. Read the component definition.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.