The largest absolute separation between sen.V[1] and sen.V[3] is 0.14407 V, at a saved time of 117,504 s. At that checkpoint the two values are 277.418 V and 277.562 V, respectively. This is a comparison between the named channels under the published test conditions.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named WindTurbine_N. The source file places it under Electrical, AC, Three Phases Unbalanced, Sources. We used the 101 stored values for sen.V[1] over the interval 0 to 172,800 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name weaDat (Reader TMY3), weaBus (Bus), res (Resistive N), sou (Grid N). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

At 117,504 s, sen.V[1] is 277.418 V and sen.V[3] is 277.562 V. Subtracting the second value from the first gives -0.14407 V. This is their largest recorded absolute separation. A difference between an inlet and an outlet, or between a command and a response, need not be a measurement error.

Wind turbine AC model with neutral cable. The simulated sen.V[1] channel runs from 277.128 to 277.418 source units over 172,800 seconds.
Wind turbine AC model with neutral cable. The simulated sen.V[1] channel runs from 277.128 to 277.418 source units over 172,800 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 114,048 to 115,776 seconds. Subtracting 277.259 from 277.354 gives 0.09549 source units. Its location brackets the change within one saved interval of 1,728 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

sen.V[1] (V)

sen.V[3] (V)

0

277.1281

277.1281

34560

277.1281

277.1281

69120

277.1281

277.1281

103680

277.1281

277.1281

114048

277.2586

277.3237

115776

277.3541

277.4667

117504

277.4177

277.5618

138240

277.1281

277.1281

172800

277.1281

277.1281

What to check on site

Keep voltage, current, real power and energy distinct. Establish the reference direction at the measurement terminal before interpreting a sign change as import or export. Compare the same load boundary and duration in site data and the simulation.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Units in the source model

The component declarations identify the scale of the exported variables. In this run, sen.V[1] uses V and sen.V[3] uses V. Keep the exact channel name and unit together when exporting data to a historian. Read the component definition.