The T1.y trace ranges from 268.884 to 297.416 across 101 saved checkpoints. It begins at 283.15 and finishes at 283.15 after 86,400 s of test time. The reference export does not state a verified engineering unit for this value. Use its native scale when comparing another run of the same model.
The system being tested
The largest change in T1.y between saved samples lies between simulation times 1,728 s and 2,592 s. The channel moves from 268.884 to 297.416 across that interval. A finer export is needed to resolve what happens between those observations.
The component declarations name T1 (Sine), T2 (Sine), T3 (Sine), TEnv (Sine). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The two named channels have separate paths in the model. T1.y begins at 283.15 and ends at 283.15. TEnv.y begins at 283.15 and ends at 283.15. The reference export supplies numerical samples but does not attach a physical unit to these fields. Use the linked model declarations to establish the quantity and units of each channel before calculating a difference or assigning it a physical meaning.
Reproduce the calculation
The largest absolute change between consecutive stored points appears from 1,728 to 2,592 seconds. Subtracting 268.884 from 297.416 gives 28.532 source units. Its location brackets the change within one saved interval of 864 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | T1.y (source units) | TEnv.y (source units) |
|---|---|---|
0 | 283.15 | 283.15 |
1728 | 268.8842 | 297.8843 |
2592 | 297.4158 | 275.9237 |
17280 | 283.15 | 268.8842 |
34560 | 283.15 | 274.3332 |
51840 | 283.15 | 291.9668 |
69120 | 283.15 | 297.4158 |
86400 | 283.15 | 283.15 |
What to check on site
Keep voltage, current, real power and energy distinct. Establish the reference direction at the measurement terminal before interpreting a sign change as import or export. Compare the same load boundary and duration in site data and the simulation.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Checking the two recorded channels
At 2,592 s, T1.y reads 297.416 and TEnv.y reads 275.924. Across the run, the second channel ranges from 268.18 to 298.12. Compare the timing of changes on the two traces. A numerical difference between these channels has no demonstrated physical meaning without matching quantity definitions and units.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.