The TBorFieIn[1].T trace covers 0.7508 to 14.845 °C, a temperature span of 14.094 K. The first recorded maximum occurs at 31,536,000 seconds. The numerical source and data table retain the original kelvin values. Subtract 273.15 only when converting an absolute temperature to Celsius.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named TransientBoreholeDynamics. The source file places it under Fluid, Geothermal, Zoned Borefields. We used the 101 stored values for TBorFieIn[1].T over the interval 0 to 31,536,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name borHol (One U Tube), borFieDat (Validation), timTabT (Combi Time Table). The source declares T_start = 273.15. These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel TBorFieOut[1].T covers 273.15 to 287.244 K. At 1,261,440 s, the primary value is 278.205 and the companion is 277.454. Their signed difference is 0.7509 K, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Transient borehole dynamics. The simulated TBorFieIn[1].T channel runs from 273.901 to 287.995 K over 31,536,000 seconds.
Transient borehole dynamics. The simulated TBorFieIn[1].T channel runs from 273.901 to 287.995 K over 31,536,000 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 25,859,520 to 26,174,880 seconds. Subtracting 281.902 from 285.999 gives 4.097 K. Its location brackets the change within one saved interval of 315,360 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

TBorFieIn[1].T (K)

TBorFieOut[1].T (K)

0

273.9008

273.15

6307200

279.9058

279.155

1.26144e+07

282.5426

281.7918

1.89216e+07

280.4517

280.4517

2.52288e+07

281.9086

281.9086

2.585952e+07

281.9021

281.9021

2.617488e+07

285.9994

285.2485

3.1536e+07

287.995

287.2441

What to check on site

The thermal history of a borefield matters across repeated loads. Distinguish a fluid outlet reading from pipe wall, grout and far-field temperatures. Record the duration and sign of each heat pulse before comparing an installation with a reference case.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.

Cover photograph by Jakub Zerdzicki, via Pexels. The photograph illustrates the subject. Industry Applied produced the figure and calculations from the linked source.