The bui.Q_flow series gives a net 212.961 kWh over 86,400 s when the saved power samples are joined by straight lines. The highest recorded power is 20,057.7 W. The sign follows the model’s measurement boundary. It matters when a connector can exchange energy in either direction.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named BuildingTimeSeriesAtETS. The source file places it under DHC, Loads, Steam. We used the 101 stored values for bui.Q_flow over the interval 1,728,000 to 1,814,400 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name souSte (Boundary p T), watSin (Boundary p T). The source declares pSat = 400000, Q_flow_nominal = 2e4. These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
At 1,728,864 s, bui.Q_flow reads 5,162.2 W and bui.vol.m_flow reads 0.002308 kg/s. Across the run, the second channel ranges from 0 kg/s to 0.0089684 kg/s. Compare the timing of changes on the two traces. A numerical difference between these channels has no demonstrated physical meaning without matching quantity definitions and units.

Reproduce the calculation
Integrating the signed bui.Q_flow samples by the trapezoidal rule gives 212.961 kWh over 86,400 seconds. For each pair, average the two powers in watts and multiply by the interval in seconds. Sum the watt-seconds and divide by 3,600,000. This value refers to the selected simulation connector and should be assigned to a physical load only after confirming the boundary and sign.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | bui.Q_flow (W) | bui.vol.m_flow (kg/s) |
|---|---|---|
1728000 | 4000 | 0 |
1728864 | 5162.193 | 0.002307971 |
1745280 | 19580.07 | 0.008754783 |
1748736 | 20057.75 | 0.008968414 |
1762560 | 14426.47 | 0.006450595 |
1779840 | 3595.837 | 0.001607868 |
1797120 | 1269.893 | 0.0005678064 |
1814400 | 4000 | 0.001788465 |
What to check on site
Compare fuel or electrical input with useful heat at a declared delivery boundary. Include the warm-up interval and any period on standby. Separate a temperature setpoint from the measured outlet and keep auxiliary energy in a stated part of the balance.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.