The recorded withWSE.uOpeDow channel spans 0.65 to 0.85 source units in this reference run. It starts at 0.65 and ends at 0.75. The first recorded maximum occurs at 2,412 seconds and the first minimum at 0 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named Down. The source file places it under Controls, OBC, ASHRAE, G36, Plants, Chillers, Staging, Set Points, Subsequences. We used the 101 stored values for withWSE.uOpeDow over the interval 0 to 3,600 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name withWSE (Down), withWSE1 (Down), noWSE (Down), stage2 (Constant). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel withWSE1.TWsePre covers 281.651 to 289.65 source units. At 540 s, the primary value is 0.674 and the companion is 289.646. Their signed difference is -288.972 source units, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Subsequences down. The simulated withWSE.uOpeDow channel runs from 0.65 to 0.85 source units over 3,600 seconds.
Subsequences down. The simulated withWSE.uOpeDow channel runs from 0.65 to 0.85 source units over 3,600 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 1,188 to 1,224 seconds. Subtracting 0.7484 from 0.7531 gives 0.004712 source units. Its location brackets the change within one saved interval of 36 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

withWSE.uOpeDow (source units)

withWSE1.TWsePre (source units)

0

0.65

285.65

720

0.6912215

288.9883

1188

0.7484292

284.045

1224

0.7531411

283.6604

1440

0.7809017

281.9719

2160

0.8451056

286.3642

2412

0.8499877

288.8648

2880

0.8309017

288.5412

3600

0.75

281.7503

What to check on site

Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.