The archived response ranges from 15 to 36. The median is 29.5 and the central half of the measurements extends from 25.25 to 32.5. Those figures use all 12 numeric observations in this source series and retain its original measurement scale.

What was measured

The PAINTS data file has 25 header lines before the tabulated area. The header supplies the test context, column order and reading instructions. This analysis uses the column described as lifetime of paints. It preserves the source scale and its sign. The file contains 4 numeric fields per accepted row.

Spread across the original readings

The tenth percentile is 17.3 and the ninetieth is 34.9. They provide a narrower description of the typical spread than the minimum and maximum. The largest and smallest observed records are separated by 21. This is the range of this sample, rather than a guaranteed operating envelope.

Street-marking paint life. The 25th, 50th and 75th percentiles of the measurements are 25.25, 29.5 and 32.5.
Street-marking paint life. The 25th, 50th and 75th percentiles of the measurements are 25.25, 29.5 and 32.5. Figure by Industry Applied.

One row you can check

To check a real observation, take numeric row 4 after the header. Its response is 30. The overall arithmetic mean is 27.75, so this observation is 2.25 units from the mean on the original scale. Sorting the whole response gives an interquartile spread of 7.25, calculated by subtracting 25.25 from 32.5.

The centre and spread are descriptive statistics. Each numeric observation carries the same weight in the overall summary. Treat grouped results as a way to find a measurement difference worth investigating. They do not adjust simultaneously for all factors, run order, sample selection or repeated measurements in the original study.

Worked data

Percentile

Observed response (source scale)

Number of numeric rows

0

15

12

10

17.3

12

25

25.25

12

50

29.5

12

75

32.5

12

90

34.9

12

100

36

12

Implications for an industrial comparison

Compare the specimen geometry, preparation, loading direction, conditioning and endpoint before using this distribution in a materials decision. Failure observations from a controlled test do not directly provide a field failure probability. A comparison with current production also needs the number of specimens withdrawn before the stated endpoint.

Choose a decision threshold in the engineering units before collecting a local series. Preserve raw readings, any exclusions and a record of the operating conditions so that a later analyst can separate a real change from differences in data handling.

Source file and worked data

The original NIST Dataplot header and measurements include the study attribution. Download the complete source file. Download the worked data used in the figure.