The ratFlo.y[1] trace ranges from 0 to 1 across 101 saved checkpoints. It begins at 0 and finishes at 1 after 10,800 s of test time. The reference export does not state a verified engineering unit for this value. Use its native scale when comparing another run of the same model.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named StagingHeadered. The source file places it under Templates, Plants, Controls, Pumps, Generic. We used the 101 stored values for ratFlo.y[1] over the interval 0 to 10,800 seconds. This is a simulated test with specified inputs and boundaries.

The largest change in ratFlo.y[1] between saved samples lies between simulation times 5,832 s and 5,940 s. The channel moves from 0.76 to 0.7 across that interval. A finer export is needed to resolve what happens between those observations.

Compare the recorded channels

At 5,940 s, ratFlo.y[1] reads 0.7 and u1.y[1] reads 1. Across the run, the second channel ranges from 0 to 1. Compare the timing of changes on the two traces. A numerical difference between these channels has no demonstrated physical meaning without matching quantity definitions and units.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 5,832 to 5,940 seconds. Subtracting 0.76 from 0.7 gives -0.06 source units. Its location brackets the change within one saved interval of 108 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

ratFlo.y[1] (source units)

u1.y[1] (logical state)

0

0

0

2160

0.6

1

3672

1

1

4320

1

1

5832

0.76

1

5940

0.7

1

6480

0.4

1

8640

0.4

0

10800

1

0

What to check on site

Mark the measurement points on a hydraulic schematic and identify whether the controller holds flow or differential pressure. Record pump command and delivered duty together. A site comparison needs the same branch state, including bypasses and closed valves.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Units in the source model

The component declarations identify the scale of the exported variables. In this run, u1.y[1] uses logical state. Keep the exact channel name and unit together when exporting data to a historian. Read the component definition.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.