The signed flow trace gives a net 38,163.9 kg over 100,000 s, using the trapezoidal rule between saved samples. The smallest and largest reported rates are 0.20221 kg/s and 0.55997 kg/s. Check the positive flow direction in the model before using the sign to describe delivery or return.
The system being tested
The RWTH Aachen University E.ON Energy Research Center publishes the AixLib test named OpenLoopHeatPumpCarnot. The source file places it under Fluid, District Heating Cooling, Demands. We used the 101 stored values for demand.port_a.m_flow over the interval 0 to 100,000 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name sourceIdeal (Source Ideal), pipeSupply (Plug Flow Pipe), pipeReturn (Plug Flow Pipe), TSet (Constant). The source declares T_amb = 283.15. These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
At 1,000 s, demand.port_a.m_flow reads 0.49259 kg/s and demand.senT_supply.T reads 293.092 K. Across the run, the second channel ranges from 288.15 K to 293.1 K. Compare the timing of changes on the two traces. A numerical difference between these channels has no demonstrated physical meaning without matching quantity definitions and units.

Reproduce the calculation
Integrating the signed rate over 100,000 seconds gives a net 38,164 kg. This estimate averages neighbouring stored rates and multiplies by their time separation. Reverse flow reduces the net total. If a process requires gross throughput, calculate forward and reverse transfers separately at the appropriate boundary.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | demand.port_a.m_flow (kg/s) | demand.senT_supply.T (K) |
|---|---|---|
0 | 0.352932 | 288.15 |
1000 | 0.4925872 | 293.0916 |
20000 | 0.3826247 | 293.0729 |
33000 | 0.5599661 | 293.1002 |
40000 | 0.3826245 | 293.0728 |
58000 | 0.2022074 | 293.0068 |
60000 | 0.3826243 | 293.0728 |
80000 | 0.3826242 | 293.0728 |
100000 | 0.3826244 | 293.0728 |
What to check on site
Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.


