The recorded ena.QChiWatReq_flow channel spans 0 to 636,397 W in this reference run. It starts at 0 and ends at 1,428. The first recorded maximum occurs at 54,432 seconds and the first minimum at 0 seconds.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named EnableAndModeControl. The source file places it under Templates, Plants, Controls, Heat Recovery Chillers. We used the 101 stored values for ena.QChiWatReq_flow over the interval 0 to 86,400 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name THeaWatRet (Constant), TChiWatRet (Constant), VHeaWat_flow (Multiply By Parameter), VChiWat_flow (Multiply By Parameter). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The companion channel ena.QHeaWatReq_flow covers 0 to 978,261 W. At 22,464 s, the primary value is 13,975 and the companion is 978,261. Their signed difference is -964,286 W, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Reproduce the calculation
Integrating the signed ena.QChiWatReq_flow samples by the trapezoidal rule gives 5,432 kWh over 86,400 seconds. For each pair, average the two powers in watts and multiply by the interval in seconds. Sum the watt-seconds and divide by 3,600,000. This value refers to the selected simulation connector and should be assigned to a physical load only after confirming the boundary and sign.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | ena.QChiWatReq_flow (W) | ena.QHeaWatReq_flow (W) |
|---|---|---|
0 | 0 | 0 |
17280 | 0 | 0 |
34560 | 253980.3 | 604919.5 |
51840 | 596872.9 | 71531.06 |
54432 | 636396.9 | 0 |
69120 | 299380 | 0 |
77760 | 101012.2 | 0 |
78624 | 80952.97 | 0 |
86400 | 1427.549 | 0 |
What to check on site
Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.