The TUTubOut.T trace covers 10 to 23.24 °C, a temperature span of 13.24 K. The first recorded maximum occurs at 36,000 seconds. The numerical source and data table retain the original kelvin values. Subtract 273.15 only when converting an absolute temperature to Celsius.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named Borefields. The source file places it under Fluid, Geothermal, Borefields. We used the 101 stored values for TUTubOut.T over the interval 0 to 36,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name borFie2UTubPar (Two U Tubes), sou1 (Mass Flow Source T), T2UTubParIn (Temperature Two Port), sin1 (Boundary p T). The source declares tLoaAgg = 300, TGro = 283.15. These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel T2UTubParOut.T covers 282.715 to 295.077 K. At 1,080 s, the primary value is 292.628 and the companion is 284.324. Their signed difference is 8.304 K, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Several borefield configurations operating simultaneously. The simulated TUTubOut.T channel runs from 283.15 to 296.39 K over 36,000 seconds.
Several borefield configurations operating simultaneously. The simulated TUTubOut.T channel runs from 283.15 to 296.39 K over 36,000 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 360 to 720 seconds. Subtracting 283.508 from 289.624 gives 6.116 K. Its location brackets the change within one saved interval of 360 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

TUTubOut.T (K)

T2UTubParOut.T (K)

0

283.15

283.15

360

283.508

282.7346

720

289.6244

282.7153

7200

294.8859

292.704

14400

295.5803

293.8555

21600

295.9537

294.4317

28800

296.2034

294.8056

36000

296.3897

295.0775

What to check on site

The thermal history of a borefield matters across repeated loads. Distinguish a fluid outlet reading from pipe wall, grout and far-field temperatures. Record the duration and sign of each heat pulse before comparing an installation with a reference case.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.

Cover photograph by Jakub Zerdzicki, via Pexels. The photograph illustrates the subject. Industry Applied produced the figure and calculations from the linked source.