The conTSupSet.TOut trace covers 13 to 23 °C, a temperature span of 10 K. The first recorded maximum occurs at 21,600 seconds. The numerical source and data table retain the original kelvin values. Subtract 273.15 only when converting an absolute temperature to Celsius.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named SupplyTemperature. The source file places it under Controls, OBC, ASHRAE, G36, AH Us, Multi Zone, variable air volume, Set Points. We used the 101 stored values for conTSupSet.TOut over the interval 0 to 86,400 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name conTSupSet (Supply Temperature), outTem (Sin), supFanSta (Pulse), opeMod (Ramp). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The companion channel conTSupSet.maxSupTemRes.y starts at 291.15, ends at 291.15 and has a recorded range of 285.15 to 291.15 source units. Its time span matches the primary channel. Both are included to put the primary response in context. Their numerical scales may represent different physical quantities.

Reproduce the calculation
The largest absolute change between consecutive stored points appears from 0 to 864 seconds. Subtracting 291.15 from 291.464 gives 0.314 K. Its location brackets the change within one saved interval of 864 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | conTSupSet.TOut (K) | conTSupSet.maxSupTemRes.y (source units) |
|---|---|---|
0 | 291.15 | 291.15 |
864 | 291.464 | 291.15 |
17280 | 295.9053 | 285.15 |
21600 | 296.15 | 285.15 |
34560 | 294.0889 | 291.15 |
51840 | 288.2111 | 288.95 |
64800 | 286.15 | 285.15 |
69120 | 286.3947 | 291.15 |
86400 | 291.15 | 291.15 |
What to check on site
Separate a calculated setpoint from the damper or fan command and from the measured service delivered. Trend the active operating mode, request, actual flow and zone condition on one clock. A sequence can change state correctly while the terminal fails to reach duty.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.

