The recorded plaReq.TAirSup channel spans 285.15 to 293.15 source units in this reference run. It starts at 285.15 and ends at 293.15. The first recorded maximum occurs at 3,600 seconds and the first minimum at 0 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named PlantRequests. The source file places it under Controls, OBC, ASHRAE, G36, AH Us, Multi Zone, variable air volume, Set Points. We used the 101 stored values for plaReq.TAirSup over the interval 0 to 3,600 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name plaReq (Plant Requests), plaReq1 (Plant Requests), supTem (Ramp), supTemSet (Ramp). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel plaReq.TAirSupSet covers 293.15 to 308.15 source units. At 3,600 s, the primary value is 293.15 and the companion is 308.15. Their signed difference is -15 source units, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Set points plant requests. The simulated plaReq.TAirSup channel runs from 285.15 to 293.15 source units over 3,600 seconds.
Set points plant requests. The simulated plaReq.TAirSup channel runs from 285.15 to 293.15 source units over 3,600 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 576 to 612 seconds. Subtracting 286.43 from 286.51 gives 0.08002 source units. Its location brackets the change within one saved interval of 36 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

plaReq.TAirSup (source units)

plaReq.TAirSupSet (source units)

0

285.15

293.15

576

286.43

295.55

612

286.51

295.7

720

286.75

296.15

1440

288.35

299.15

2160

289.95

302.15

2880

291.55

305.15

3600

293.15

308.15

What to check on site

Separate a calculated setpoint from the damper or fan command and from the measured service delivered. Trend the active operating mode, request, actual flow and zone condition on one clock. A sequence can change state correctly while the terminal fails to reach duty.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.