The EPum.y trace ranges from 0 to 1.644e+10 across 101 saved checkpoints. It begins at 0 and finishes at 1.644e+10 after 604,800 s of test time. The reference export does not state a verified engineering unit for this value. Use its native scale when comparing another run of the same model.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named SeriesVariableFlow. The source file places it under DHC, Combined. We used the 101 stored values for EPum.y over the interval 0 to 604,800 seconds. This is a simulated test with specified inputs and boundaries.

The largest change in EPum.y between saved samples lies between simulation times 538,272 s and 544,320 s. The channel moves from 1.441e+10 to 1.464e+10 across that interval. A finer export is needed to resolve what happens between those observations.

Compare the recorded channels

The two named channels have separate paths in the model. EPum.y begins at 0 and ends at 1.6442e+10. ETot.y begins at 0 and ends at 1.1226e+11. The reference export supplies numerical samples but does not attach a physical unit to these fields. Use the linked model declarations to establish the quantity and units of each channel before calculating a difference or assigning it a physical meaning.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 538,272 to 544,320 seconds. Subtracting 14,414,713,856 from 14,636,554,240 gives 221,840,384 source units. Its location brackets the change within one saved interval of 6,048 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

EPum.y (source units)

ETot.y (source units)

0

0

0

120960

3.028319e+09

1.545779e+10

241920

6.095654e+09

3.169185e+10

362880

9.262771e+09

5.107013e+10

483840

1.28268e+10

8.122608e+10

538272

1.441471e+10

9.402098e+10

544320

1.463655e+10

9.651239e+10

604800

1.644236e+10

1.122642e+11

What to check on site

Trace the transfer boundary between the central network and the local load. Identical terminal duty can coincide with different distribution losses and pump inputs. Use simultaneous primary and secondary measurements before allocating an energy difference to one side.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Checking the two recorded channels

At 544,320 s, EPum.y reads 1.464e+10 and ETot.y reads 9.651e+10. Across the run, the second channel ranges from 0 to 1.123e+11. Compare the timing of changes on the two traces. A numerical difference between these channels has no demonstrated physical meaning without matching quantity definitions and units.