The TBorFieIn.T trace covers 9.838 to 16.529 °C, a temperature span of 6.691 K. The first recorded maximum occurs at 2,436,480 seconds. The numerical source and data table retain the original kelvin values. Subtract 273.15 only when converting an absolute temperature to Celsius.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named SeriesConnectedZones. The source file places it under Fluid, Geothermal, Zoned Borefields. We used the 101 stored values for TBorFieIn.T over the interval 0 to 2,592,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name borHol (One U Tube), pum (Flow Controlled m flow), TBorFieIn (Temperature Two Port), TBorFieOut (Temperature Two Port). The source declares T_start = 283.15. These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel TBorFieOut.T covers 282.5 to 287.062 K. At 0 s, the primary value is 285.825 and the companion is 283.15. Their signed difference is 2.675 K, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Series-connected zoned borefields. The simulated TBorFieIn.T channel runs from 282.988 to 289.679 K over 2,592,000 seconds.
Series-connected zoned borefields. The simulated TBorFieIn.T channel runs from 282.988 to 289.679 K over 2,592,000 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 0 to 25,920 seconds. Subtracting 285.825 from 287.821 gives 1.996 K. Its location brackets the change within one saved interval of 25,920 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

TBorFieIn.T (K)

TBorFieOut.T (K)

0

285.8249

283.15

25920

287.8211

285.204

336960

282.988

282.5554

518400

287.2759

285.2053

1036800

284.7363

284.0234

1555200

283.5349

283.1588

2073600

284.2444

283.8683

2436480

289.6791

287.0299

2592000

286.433

285.7202

What to check on site

The thermal history of a borefield matters across repeated loads. Distinguish a fluid outlet reading from pipe wall, grout and far-field temperatures. Record the duration and sign of each heat pulse before comparing an installation with a reference case.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.