The archived enaPro.uChaCel[2] output switches 1 time between consecutive checkpoints. Its first change, from 0 to 1, falls between 380 s and 390 s. The exact switching instant can fall anywhere inside that saved interval.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named StageProcesses. The source file places it under Controls, OBC, ASHRAE, G36, Plants, Chillers, Towers, Staging, Subsequences. We used the 101 stored values for enaPro.uChaCel[2] over the interval 0 to 1,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name enaPro (Stage Processes), disPro (Stage Processes), enaPro1 (Stage Processes), disPro1 (Stage Processes). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

At 390 s, enaPro.uChaCel[2] reads 1 and enaPro.u1InlIsoValClo[2] reads 0. Across the run, the second channel ranges from 0 to 1. Compare the timing of changes on the two traces. A numerical difference between these channels has no demonstrated physical meaning without matching quantity definitions and units.

Sequence of tower cells staging process. The simulated enaPro.uChaCel[2] channel runs from 0 to 1 source units over 1,000 seconds.
Sequence of tower cells staging process. The simulated enaPro.uChaCel[2] channel runs from 0 to 1 source units over 1,000 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 380 to 390 seconds. Subtracting 0 from 1 gives 1 source units. Its location brackets the change within one saved interval of 10 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

enaPro.uChaCel[2] (logical state)

enaPro.u1InlIsoValClo[2] (logical state)

0

0

1

200

0

1

380

0

1

390

1

0

400

1

0

600

1

0

800

1

0

1000

1

0

What to check on site

Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Units in the source model

The component declarations identify the scale of the exported variables. In this run, enaPro.uChaCel[2] uses logical state and enaPro.u1InlIsoValClo[2] uses logical state. Keep the exact channel name and unit together when exporting data to a historian. Read the component definition.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.