The recorded prv.dp channel spans 0 to 400,000 Pa in this reference run. It starts at 0 and ends at 400,000. The first recorded maximum occurs at 15 seconds and the first minimum at 0 seconds.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named ValveSelfActing. The source file places it under DHC, Loads, Steam. We used the 101 stored values for prv.dp over the interval 0 to 15 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name prv (Valve Self Acting), sou (Boundary p T), speEntIn (Specific Enthalpy Two Port), speEntOut (Specific Enthalpy Two Port). The source declares m_flow_nominal = 1. These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The companion channel prv.port_a.p covers 300,000 to 700,000 Pa. At 4.8 s, the primary value is 128,000 and the companion is 428,000. Their signed difference is -300,000 Pa, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Reproduce the calculation
The largest absolute change between consecutive stored points appears from 8.55 to 8.7 seconds. Subtracting 228,000 from 232,000 gives 4,000 Pa. Its location brackets the change within one saved interval of 0.15 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | prv.dp (Pa) | prv.port_a.p (Pa) |
|---|---|---|
0 | 0 | 300000 |
3 | 80000 | 380000 |
6 | 160000 | 460000 |
8.55 | 228000 | 528000 |
8.7 | 232000 | 532000 |
9 | 240000 | 540000 |
12 | 320000 | 620000 |
15 | 400000 | 700000 |
What to check on site
Compare fuel or electrical input with useful heat at a declared delivery boundary. Include the warm-up interval and any period on standby. Separate a temperature setpoint from the measured outlet and keep auxiliary energy in a stated part of the balance.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.
