The published pidSca.y signal spans -0.262 to 1 source signal units in the reference run. It starts at 1 and finishes at -0.002131. The signed change between those endpoint samples is -1.002 source signal units.
What the reference test measures
The Buildings model named PIDScale comes from Lawrence Berkeley National Laboratory. The saved result covers simulation time 0 to 100 seconds. Industry Applied extracted 101 checkpoints for pidSca.y and kept the original signed values. The regular output spacing is 1 seconds. The solver may take different internal steps.
The model definition identifies pidSca (PID), pidNoSca (PID), pulse (Pulse). These component names let a reader trace the plotted tags to their owning blocks before reproducing the result.
Settings to preserve when repeating the experiment
The published test declares pulse.amplitude = 1000, pulse.period = 50, pidSca.k = 2. Those numbers use the units and component definitions in the linked model. Start with the declared configuration when reproducing the reference result, then vary one setting at a time. Changing the input waveform and the component response in the same comparison makes it difficult to identify the source of a difference.
Reading the two channels
At 0 seconds, pidSca.y is 1 and pidNoSca.y is 1. Subtracting the second channel from the first gives 0 source signal units, the largest absolute separation on their common saved grid. The channels have distinct roles in the model, so this difference describes the two traces and is not a calibrated instrument error.

Reproducing the largest recorded change
Between the stored points at 0 and 1 seconds, pidSca.y changes from 1 to 0.479. Subtracting the earlier reading gives -0.521 source signal units. This interval contains the largest absolute point-to-point change in the saved primary channel. A faster excursion followed by recovery could fit entirely between the two records.
The extrema in the table and figure are extrema of the stored series. A solver’s internal peak, a field logger’s alarm value and a maximum derived from this export can differ. Preserve the sampling settings when comparing results.
Worked data
Simulation time (s) | pidSca.y (signal units) | pidNoSca.y (signal units) |
|---|---|---|
0 | 1 | 1 |
1 | 0.4789353 | 0.4789353 |
25 | 0.001590027 | 0.001590027 |
28 | -0.2615013 | -0.2615013 |
50 | -0.002140826 | -0.002140826 |
75 | 0.002130736 | 0.002130736 |
100 | -0.002130822 | -0.002130822 |
Applying the result to an operating site
Preserve the signal ranges used to normalise the feedback and command. The same numerical controller gain can mean a different physical action when those ranges change. Compare feedback tracking as well as maximum command.
For an Australian monitoring project, write the intended sample interval, timestamp convention, tag units and missed-update policy into the acceptance record. Re-run this comparison on the installed signal path and retain the raw export so a later dashboard change can be checked against the same baseline.
Model and data sources
Model definition. Original numerical reference series. Simulation and plotting script. Source project. Download the worked checkpoints as CSV.