The recorded sen.I[1] channel spans 10.997 to 16.495 source units in this reference run. It starts at 10.997 and ends at 16.495. The first recorded maximum occurs at 0.75 seconds and the first minimum at 0 seconds.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named Loads_N. The source file places it under Electrical, AC, Three Phases Unbalanced, Loads. We used the 101 stored values for sen.I[1] over the interval 0 to 1 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name sou (Fixed Voltage N), ph_1 (Ramp), ph_23 (Constant), loaR_N (Resistive N). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The model begins with balanced loads and subsequently changes the loading. Trace the three phase currents and the neutral conductor separately on the same time axis. A magnitude difference between one phase and the neutral is a consequence of circuit conditions, and is not a measure of current-sensor accuracy.
![How an unbalanced three-phase load changes the neutral current. The simulated sen.I[1] channel runs from 10.997 to 16.495 source units over 1 seconds.](https://static.wixstatic.com/media/21e41b_d4c4c72b9624456caa81306ff391f3e8~mv2.png/v1/fill/w_616,h_345,al_c,q_85,enc_auto/21e41b_d4c4c72b9624456caa81306ff391f3e8~mv2.png)
Reproduce the calculation
The largest absolute change between consecutive stored points appears from 0.73 to 0.74 seconds. Subtracting 16.275 from 16.385 gives 0.11 source units. Its location brackets the change within one saved interval of 0.01 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | sen.I[1] (source units) | sen.I[4] (source units) |
|---|---|---|
0 | 10.99667 | 0 |
0.2 | 10.99667 | 0 |
0.4 | 12.64617 | 1.6495 |
0.6 | 14.8455 | 3.848833 |
0.73 | 16.27507 | 5.2784 |
0.74 | 16.38503 | 5.388367 |
0.75 | 16.495 | 5.498333 |
0.8 | 16.495 | 5.498333 |
1 | 16.495 | 5.498333 |
What to check on site
Keep voltage, current, real power and energy distinct. Establish the reference direction at the measurement terminal before interpreting a sign change as import or export. Compare the same load boundary and duration in site data and the simulation.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.


![How an unbalanced three-phase load changes the neutral current. sen.I[1] (source units) ranges from 10.997 to 16.495 across the recorded simulation time (s) interval of 0 to 1. Bands show the minimum and maximum per group of samples. Crossbars mark the median.](/story-art/9d9e563b3cf384945.webp)