The TIn.y trace ranges from 271.15 to 279.15 across 101 saved checkpoints. It begins at 279.15 and finishes at 279.15 after 3,600 s of test time. The reference export does not state a verified engineering unit for this value. Use its native scale when comparing another run of the same model.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named LMTDStar. The source file places it under Fluid, Storage, Ice. We used the 101 stored values for TIn.y over the interval 0 to 3,600 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name lmtdSta (LMTD Star), TIn (Cosine), TOut (Cosine). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The input and output temperature signals are boundary conditions for evaluating the function. To reproduce its result, use the temperature differences specified by the function and retain the order of the hot and cold endpoints. The range of one driving temperature alone does not give a log-mean temperature difference.
Reproduce the calculation
The largest absolute change between consecutive stored points appears from 864 to 900 seconds. Subtracting 275.401 from 275.15 gives -0.2512 source units. Its location brackets the change within one saved interval of 36 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | TIn.y (source units) | TOut.y (source units) |
|---|---|---|
0 | 279.15 | 271.15 |
720 | 276.3861 | 273.9139 |
864 | 275.4012 | 274.8988 |
900 | 275.15 | 275.15 |
1440 | 271.9139 | 278.3861 |
1800 | 271.15 | 279.15 |
2160 | 271.9139 | 278.3861 |
2880 | 276.3861 | 273.9139 |
3600 | 279.15 | 271.15 |
What to check on site
Identify the stored quantity and the boundary through which energy or mass enters. A layer temperature, outlet temperature and volume mean describe different states. Preserve initial inventory and the sequence of charge or discharge when repeating the case.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Checking the two recorded channels
At 900 s, TIn.y reads 275.15 and TOut.y reads 275.15. Across the run, the second channel ranges from 271.15 to 279.15. Compare the timing of changes on the two traces. A numerical difference between these channels has no demonstrated physical meaning without matching quantity definitions and units.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.


