The published grid.P.real signal spans -5,000 to 5,000 W in the reference run. It starts at 5,000 and finishes at -5,000. The signed change between those endpoint samples is -10,000 W.

What the reference test measures

The Buildings model named GeneratorLoadGrid comes from Lawrence Berkeley National Laboratory. The saved result covers simulation time 0 to 1 seconds. Industry Applied extracted 101 checkpoints for grid.P.real and kept the original signed values. The regular output spacing is 0.01 seconds. The solver may take different internal steps.

The model definition identifies grid (Grid), sou (Generator), res (Inductive). These component names let a reader trace the plotted tags to their owning blocks before reproducing the result.

Settings to preserve when repeating the experiment

The published test declares grid.f = 60, grid.V = 120, sou.f = 60. Those numbers use the units and component definitions in the linked model. Start with the declared configuration when reproducing the reference result, then vary one setting at a time. Changing the input waveform and the component response in the same comparison makes it difficult to identify the source of a difference.

Reading the two channels

The companion channel grid.P.apparent spans 2,482.092 to 7,620.737 VA across its 101 stored values. The primary trace first reaches its recorded maximum at 0 seconds and its minimum at 0.7 seconds. A time-aligned comparison preserves the meaning and units of each channel.

Real power at the grid connection. In the simulated GeneratorLoadGrid case, grid.P.real ranges from -5,000 to 5,000 W over 1 seconds.
Real power at the grid connection. In the simulated GeneratorLoadGrid case, grid.P.real ranges from -5,000 to 5,000 W over 1 seconds. Figure by Industry Applied.

Reproducing the largest recorded change

Between the stored points at 0.68 and 0.69 seconds, grid.P.real changes from -4,666.666 to -4,833.334. Subtracting the earlier reading gives -166.667 W. This interval contains the largest absolute point-to-point change in the saved primary channel. A faster excursion followed by recovery could fit entirely between the two records.

The extrema in the table and figure are extrema of the stored series. A solver’s internal peak, a field logger’s alarm value and a maximum derived from this export can differ. Preserve the sampling settings when comparing results.

Worked data

Simulation time (s)

grid.P.real (W)

grid.P.apparent (VA)

0

5000

5000.05

0.25

2500

2875.636

0.5

-1666.667

4173.842

0.68

-4666.666

7257.881

0.69

-4833.334

7439.032

0.7

-5000

7620.737

0.75

-5000

7620.737

1

-5000

7620.737

Applying the result to an operating site

Real power, apparent power and power factor are distinct. Use W for real power and VA for apparent power even when their numerical magnitudes are close. Document import and export sign convention before comparing with a bidirectional electricity meter.

For a local engineering comparison, write the measurement boundary, operating duty and instruments into the test record. Select comparable load or weather periods, then compare the measured trace with the simulated quantities. Establish a local acceptance tolerance using the intended duty and measurement uncertainty.

Model and data sources

Model definition. Original numerical reference series. Simulation and plotting script. Source project. Download the worked checkpoints as CSV.

Cover photograph by Connor Scott McManus, via Pexels. The photograph illustrates the subject. Industry Applied produced the figure and calculations from the linked source.