The sen.I trace ranges from -48.202 A to 0 A across 101 saved checkpoints. It begins at 0 A and finishes at 0 A after 172,800 s of test time. The source identifies the channel scale as A. Its first saved maximum occurs at 0 s.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named PVSimple. The source file places it under Electrical, DC, Sources. We used the 101 stored values for sen.I over the interval 0 to 172,800 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name pv (photovoltaic Simple), res (Resistor), sou (Constant Voltage), HDifTil (Diffuse Perez). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

At 29,376 s, sen.I reads -17.102 A and sen.V reads 12.855 V. Across the run, the second channel ranges from 12 V to 14.41 V. Compare the timing of changes on the two traces. A numerical difference between these channels has no demonstrated physical meaning without matching quantity definitions and units.

Photovoltaic simple model with constant load. The simulated sen.I channel runs from -48.202 to 0 A over 172,800 seconds.
Photovoltaic simple model with constant load. The simulated sen.I channel runs from -48.202 to 0 A over 172,800 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 27,648 to 29,376 seconds. Subtracting -4.425 from -17.102 gives -12.677 A. Its location brackets the change within one saved interval of 1,728 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

sen.I (A)

sen.V (V)

0

0

12

27648

-4.424723

12.22124

29376

-17.10194

12.8551

34560

-40.26145

14.01307

69120

0

12

103680

0

12

129600

-48.20241

14.41012

138240

-28.62286

13.43114

172800

0

12

What to check on site

Keep voltage, current, real power and energy distinct. Establish the reference direction at the measurement terminal before interpreting a sign change as import or export. Compare the same load boundary and duration in site data and the simulation.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Units in the source model

The component declarations identify the scale of the exported variables. In this run, sen.V uses V. Keep the exact channel name and unit together when exporting data to a historian. Read the component definition.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.