The largest absolute separation between grid.P[1].real and grid.P[3].real is 3,500.6 W, at a saved time of 129,600 s. At that checkpoint the two values are -4,001.1 W and -7,501.7 W, respectively. This is a comparison between the named channels under the published test conditions.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named PVPanels_N. The source file places it under Electrical, AC, Three Phases Unbalanced, Sources. We used the 101 stored values for grid.P[1].real over the interval 0 to 172,800 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name RL (Inductive N), grid (Grid N), load (Constant), HDifTil (Diffuse Perez). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

At 129,600 s, grid.P[1].real is -4,001.1 W and grid.P[3].real is -7,501.7 W. Subtracting the second value from the first gives 3,500.6 W. This is their largest recorded absolute separation. A difference between an inlet and an outlet, or between a command and a response, need not be a measurement error.

Photovoltaic panel models with neutral cable. The simulated grid.P[1].real channel runs from -4,001 to 1,000 source units over 172,800 seconds.
Photovoltaic panel models with neutral cable. The simulated grid.P[1].real channel runs from -4,001 to 1,000 source units over 172,800 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 27,648 to 29,376 seconds. Subtracting 610.656 from -582.899 gives -1,194 source units. Its location brackets the change within one saved interval of 1,728 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

grid.P[1].real (W)

grid.P[3].real (W)

0

1000

0

27648

610.6558

-584.0164

29376

-582.8987

-2374.348

34560

-3062.144

-6093.215

69120

1000

0

103680

1000

0

129600

-4001.138

-7501.707

138240

-1767.951

-4151.927

172800

1000

0

What to check on site

Keep voltage, current, real power and energy distinct. Establish the reference direction at the measurement terminal before interpreting a sign change as import or export. Compare the same load boundary and duration in site data and the simulation.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Units in the source model

The component declarations identify the scale of the exported variables. In this run, grid.P[1].real uses W and grid.P[3].real uses W. Keep the exact channel name and unit together when exporting data to a historian. Read the component definition.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.