The chi.P series gives a net 24.504 kWh over 3,600 s when the saved power samples are joined by straight lines. The highest recorded power is 31,778.3 W. The sign follows the model’s measurement boundary. It matters when a connector can exchange energy in either direction.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named Carnot_TEva_etaPL. The source file places it under Fluid, Chillers. We used the 101 stored values for chi.P over the interval 0 to 3,600 seconds. This is a simulated test with specified inputs and boundaries.
The reference file contains 13 recorded variables. Alongside the primary output there are chi.sta_a2.T, chi.sta_b2.T, chi.TSet, chi.sta_b1.T, chi.sta_a1.T. The source and the export are linked independently below so that each reading can be traced back to its calculated channel.
Compare the recorded channels
At 0 s, chi.P is 31,778.3 W and chi.QEva_flow is -100,000 W. Subtracting the second value from the first gives 131,778.3 W. This is their largest recorded absolute separation. A difference between an inlet and an outlet, or between a command and a response, need not be a measurement error.

Reproduce the calculation
Integrating the signed chi.P samples by the trapezoidal rule gives 24.504 kWh over 3,600 seconds. For each pair, average the two powers in watts and multiply by the interval in seconds. Sum the watt-seconds and divide by 3,600,000. This value refers to the selected simulation connector and should be assigned to a physical load only after confirming the boundary and sign.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | chi.P (W) | chi.QEva_flow (W) |
|---|---|---|
0 | 31778.3 | -99999.99 |
720 | 31778.3 | -99999.99 |
1440 | 31778.3 | -99999.99 |
1836 | 31625.21 | -99619.05 |
1872 | 16783.62 | -59771.43 |
2160 | 16783.62 | -59771.43 |
2880 | 16783.62 | -59771.43 |
3600 | 16783.62 | -59771.43 |
What to check on site
Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.


