The archived dayCon.y output switches 14 times between consecutive checkpoints. Its first change, from 1 to 0, falls between 24,192 s and 30,240 s. The exact switching instant can fall anywhere inside that saved interval.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named DaylightControlled. The source file places it under Controls, OBC, Outdoor Lights. We used the 101 stored values for dayCon.y over the interval 0 to 604,800 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name dayCon (Daylight Controlled). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The primary channel spends 61.4% of its saved checkpoints at or above 0.5 source units, halfway between the observed minimum and maximum. Its time-weighted mean under piecewise-linear interpolation is 0.61 source units. These two numbers distinguish how much of the run is spent high from the absolute value of its peak.

Outdoor lighting control based on daylight. The simulated dayCon.y channel runs from 0 to 1 source units over 604,800 seconds.
Outdoor lighting control based on daylight. The simulated dayCon.y channel runs from 0 to 1 source units over 604,800 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 24,192 to 30,240 seconds. Subtracting 1 from 0 gives -1 source units. Its location brackets the change within one saved interval of 6,048 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

dayCon.y (dimensionless)

0

1

24192

1

30240

0

120960

0

241920

1

362880

1

483840

0

604800

1

What to check on site

Record each condition, calculated request and issued output as separate tags. Keep timestamps and the sample or event rule with the export. A stable displayed value may be held by logic after the measured input has changed.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Units in the source model

The component declarations identify the scale of the exported variables. In this run, dayCon.y uses dimensionless. Keep the exact channel name and unit together when exporting data to a historian. Read the component definition.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.