The signed flow trace gives a net 1.112 kg over 1 s, using the trapezoidal rule between saved samples. The smallest and largest reported rates are 0.003582 kg/s and 2.2428 kg/s. Check the positive flow direction in the model before using the sign to describe delivery or return.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named DoorOpenClosed. The source file places it under Airflow, Multizone. We used the 101 stored values for dooOpeClo.port_a1.m_flow over the interval 0 to 1 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name bouA (Boundary p T), bouB (Boundary p T), doo (Door Open), lea (Effective Air Leakage Area). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
At 0.51 s, dooOpeClo.port_a1.m_flow is 2.2428 kg/s and dooOpeClo.port_b2.m_flow is 2.0128 kg/s. Subtracting the second value from the first gives 0.23003 kg/s. This is their largest recorded absolute separation. A difference between an inlet and an outlet, or between a command and a response, need not be a measurement error.

Reproduce the calculation
Integrating the signed rate over 1 seconds gives a net 1.112 kg. This estimate averages neighbouring stored rates and multiplies by their time separation. Reverse flow reduces the net total. If a process requires gross throughput, calculate forward and reverse transfers separately at the appropriate boundary.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | dooOpeClo.port_a1.m_flow (kg/s) | dooOpeClo.port_b2.m_flow (kg/s) |
|---|---|---|
0 | 0.003582013 | 0.003582013 |
0.2 | 0.003582013 | 0.003582013 |
0.4 | 0.003582013 | 0.003582013 |
0.5 | 0.003582013 | 0.003582013 |
0.51 | 2.242841 | 2.012808 |
0.6 | 2.242841 | 2.012808 |
0.8 | 2.242841 | 2.012808 |
1 | 2.242841 | 2.012808 |
What to check on site
Identify the connected zones, pressure references and flow direction. Changing a door, leakage path or boundary condition can redistribute the same total flow between branches. A differential pressure alone cannot establish the air quantity reaching a zone.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.