The recorded demand.port_a.m_flow channel spans 0.1148 to 0.1173 kg/s in this reference run. It starts at 0.1148 and ends at 0.1173. The first recorded maximum occurs at 70.702 seconds and the first minimum at 0 seconds.

The system being tested

The RWTH Aachen University E.ON Energy Research Center publishes the AixLib test named OpenLoopVarTSupplyDpBypass. The source file places it under Fluid, District Heating Cooling, Demands. We used the 24 stored values for demand.port_a.m_flow over the interval 0 to 70.702 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name sourceIdeal (Source Ideal), demand (Var T Supply pressure difference Bypass), pipeSupply (Plug Flow Pipe), pipeReturn (Plug Flow Pipe). The source declares T_amb = 283.15. These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel demand.senT_return.T starts at 333.15, ends at 410.824 and has a recorded range of 333.15 to 410.824 K. Its time span matches the primary channel. Both are included to put the primary response in context. Their numerical scales may represent different physical quantities.

Open-loop var t supply pressure difference bypass. The simulated demand.port_a.m_flow channel runs from 0.1148 to 0.1173 kg/s over 70.702 seconds.
Open-loop var t supply pressure difference bypass. The simulated demand.port_a.m_flow channel runs from 0.1148 to 0.1173 kg/s over 70.702 seconds. Figure by Industry Applied.

Reproduce the calculation

Integrating the signed rate over 70.702 seconds gives a net 8.206 kg. This estimate averages neighbouring stored rates and multiplies by their time separation. Reverse flow reduces the net total. If a process requires gross throughput, calculate forward and reverse transfers separately at the appropriate boundary.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

demand.port_a.m_flow (kg/s)

demand.senT_return.T (K)

0

0.1147871

333.15

15.36993

0.1153412

350.0299

27.66587

0.1157845

363.5339

43.0358

0.1163386

380.4138

55.33175

0.1167818

393.9178

67.62769

0.1172251

407.4218

70.70168

0.1173359

410.8244

What to check on site

Trace the transfer boundary between the central network and the local load. Identical terminal duty can coincide with different distribution losses and pump inputs. Use simultaneous primary and secondary measurements before allocating an energy difference to one side.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Download the worked checkpoints in CSV format.