The published numReq.y signal spans 0 to 2 count in the reference run. It starts at 1 and finishes at 0. The signed change between those endpoint samples is -1 count.
What the reference test measures
The Buildings model named NumberOfRequests comes from Lawrence Berkeley National Laboratory. The saved result covers simulation time 0 to 1 seconds. Industry Applied extracted 101 checkpoints for numReq.y and kept the original signed values. The regular output spacing is 0.01 seconds. The solver may take different internal steps.
The named test sits in the Controls / Continuous part of the source project. Its definition and the independent numerical file are both linked below, so the tag path and the test boundary can be checked together.
Reading the two channels
The companion channel numReq.u[1] spans -0.998 to 0.998 input units across its 101 stored values. The primary trace first reaches its recorded maximum at 0.01 seconds and its minimum at 0.26 seconds. A time-aligned comparison preserves the meaning and units of each channel.

Reproducing the largest recorded change
Between the stored points at 0 and 0.01 seconds, numReq.y changes from 1 to 2. Subtracting the earlier reading gives +1 count. This interval contains the largest absolute point-to-point change in the saved primary channel. A faster excursion followed by recovery could fit entirely between the two records.
The extrema in the table and figure are extrema of the stored series. A solver’s internal peak, a field logger’s alarm value and a maximum derived from this export can differ. Preserve the sampling settings when comparing results.
Worked data
Simulation time (s) | numReq.y (count) | numReq.u[1] (input units) |
|---|---|---|
0 | 1 | 0 |
0.01 | 2 | 0.1253332 |
0.25 | 1 | 0 |
0.26 | 0 | -0.1253334 |
0.5 | 1 | 0 |
0.75 | 2 | 0 |
1 | 0 | 0 |
Applying the result to an operating site
A request count discards identity. Two equal totals at adjacent times can represent different rooms or process areas. Retain the individual requests and their timestamps when investigating why a plant stage changed.
For an Australian monitoring project, write the intended sample interval, timestamp convention, tag units and missed-update policy into the acceptance record. Re-run this comparison on the installed signal path and retain the raw export so a later dashboard change can be checked against the same baseline.
Model and data sources
Model definition. Original numerical reference series. Simulation and plotting script. Source project. Download the worked checkpoints as CSV.
Cover photograph by ed br, via Pexels. The photograph illustrates the subject. Industry Applied produced the figure and calculations from the linked source.