The recorded r_P channel spans 0 to 1 source units in this reference run. It starts at 0 and ends at 1. The first recorded maximum occurs at 1 seconds and the first minimum at 0 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named NormalizedPower. The source file places it under Fluid, Heat Exchangers, Cooling Towers, Characteristics. We used the 101 stored values for r_P over the interval 0 to 1 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name y (Real), r_P (Efficiency). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The primary channel spends 23.8% of its saved checkpoints at or above 0.5 source units, halfway between the observed minimum and maximum. Its time-weighted mean under piecewise-linear interpolation is 0.2656 source units. These two numbers distinguish how much of the run is spent high from the absolute value of its peak.

Normalized power calculation. The simulated r_P channel runs from 0 to 1 source units over 1 seconds.
Normalized power calculation. The simulated r_P channel runs from 0 to 1 source units over 1 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 0.86 to 0.87 seconds. Subtracting 0.7044 from 0.7262 gives 0.02182 source units. Its location brackets the change within one saved interval of 0.01 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

r_P (source units)

0

0

0.2

0.005242462

0.4

0.06411111

0.6

0.216

0.8

0.57475

0.86

0.7044197

0.87

0.726235

1

1

What to check on site

Record the hot and cold boundary conditions as well as the response inside the component. For a steady comparison, check that stored heat has stopped changing. For a transient comparison, keep the timing and the observation location with every reported value.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.