The recorded eqAirTemp.TEqAir channel spans 278.455 to 297.069 source units in this reference run. It starts at 278.957 and ends at 282.345. The first recorded maximum occurs at 18,606,240 seconds and the first minimum at 2,522,880 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named SimpleRoomTwoElementsNonConstantTGround. The source file places it under Thermal Zones, Reduced Order. We used the 101 stored values for eqAirTemp.TEqAir over the interval 0 to 31,536,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name TGro (Trapezoid). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The primary channel spends 33.7% of its saved checkpoints at or above 287.762 source units, halfway between the observed minimum and maximum. Its time-weighted mean under piecewise-linear interpolation is 286.365 source units. These two numbers distinguish how much of the run is spent high from the absolute value of its peak.

Non-constant ground temperature for equivalent air temperature calculation. The simulated eqAirTemp.TEqAir channel runs from 278.455 to 297.069 source units over 31,536,000 seconds.
Non-constant ground temperature for equivalent air temperature calculation. The simulated eqAirTemp.TEqAir channel runs from 278.455 to 297.069 source units over 31,536,000 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 10,406,880 to 10,722,240 seconds. Subtracting 296.664 from 283.704 gives -12.96 source units. Its location brackets the change within one saved interval of 315,360 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

eqAirTemp.TEqAir (source units)

0

278.9572

2522880

278.4553

6307200

281.3688

1.040688e+07

296.6639

1.072224e+07

283.704

1.26144e+07

286.4565

1.860624e+07

297.0692

1.89216e+07

287.3958

2.52288e+07

284.64

3.1536e+07

282.3453

What to check on site

Keep the occupied schedule, weather boundary and zone definition with the result. A change in a simulated room condition can reflect the boundary assumptions as well as the component under study. Compare occupied periods and maintain the same observation location.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.