The recorded load.v[1] channel spans 15,000 to 15,000 source units in this reference run. It starts at 15,000 and ends at 15,000. The first recorded maximum occurs at 1 seconds and the first minimum at 0 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named ACSimpleGridMedium. The source file places it under Electrical, AC, Three Phases Balanced, Lines. We used the 101 stored values for load.v[1] over the interval 0 to 1 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name network (Network), load (Inductive), E (Fixed Voltage), load_inputs (Ramp). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel load.v[2] covers -0.001677 to -0.000993 source units. At 1 s, the primary value is 15,000 and the companion is -0.000993. Their signed difference is 15,000 source units, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Network model with medium voltage. The simulated load.v[1] channel runs from 15,000 to 15,000 source units over 1 seconds.
Network model with medium voltage. The simulated load.v[1] channel runs from 15,000 to 15,000 source units over 1 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 0.52 to 0.53 seconds. Subtracting 15,000 from 15,000 gives 0.000977 source units. Its location brackets the change within one saved interval of 0.01 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

load.v[1] (source units)

load.v[2] (source units)

0

14999.99

-0.001676899

0.2

14999.99

-0.001676899

0.4

14999.99

-0.001676899

0.52

14999.99

-0.001649541

0.53

14999.99

-0.001635861

0.6

14999.99

-0.001540106

0.8

14999.99

-0.001266518

1

15000

-0.0009929311

What to check on site

Keep voltage, current, real power and energy distinct. Establish the reference direction at the measurement terminal before interpreting a sign change as import or export. Compare the same load boundary and duration in site data and the simulation.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.