The recorded sen_lin.P channel spans 49.995 to 991.736 W in this reference run. It starts at 49.995 and ends at 991.736. The first recorded maximum occurs at 0.7 seconds and the first minimum at 0 seconds.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named LinearizedLoad. The source file places it under Electrical, DC, Loads. We used the 101 stored values for sen_lin.P over the interval 0 to 1 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name NonlinearLoad (Conductor), sou (Constant Voltage), gro (Ground), Rline1 (Two Port Resistance). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The companion channel sen_nlin.P covers 50 to 1,000 W. At 0.7 s, the primary value is 991.736 and the companion is 1,000. Their signed difference is -8.264 W, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Reproduce the calculation
Integrating the signed sen_lin.P samples by the trapezoidal rule gives 0.000158 kWh over 1 seconds. For each pair, average the two powers in watts and multiply by the interval in seconds. Sum the watt-seconds and divide by 3,600,000. This value refers to the selected simulation connector and should be assigned to a physical load only after confirming the boundary and sign.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | sen_lin.P (W) | sen_nlin.P (W) |
|---|---|---|
0 | 49.9949 | 50 |
0.2 | 49.9949 | 50 |
0.4 | 426.1931 | 430 |
0.47 | 558.4524 | 563 |
0.48 | 577.9645 | 582 |
0.6 | 809.9858 | 810 |
0.7 | 991.7355 | 1000 |
0.8 | 991.7355 | 1000 |
1 | 991.7355 | 1000 |
What to check on site
Keep voltage, current, real power and energy distinct. Establish the reference direction at the measurement terminal before interpreting a sign change as import or export. Compare the same load boundary and duration in site data and the simulation.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.
Cover photograph by Connor Scott McManus, via Pexels. The photograph illustrates the subject. Industry Applied produced the figure and calculations from the linked source.