The recorded sen_dyn.I channel spans 6.253 to 12.5 A in this reference run. It starts at 12.5 and ends at 6.253. The first recorded maximum occurs at 0 seconds and the first minimum at 15 seconds.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named RCModel. The source file places it under Electrical, DC, Lines. We used the 101 stored values for sen_dyn.I over the interval 0 to 15 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name RC_ss (Two Port RC Line), constantVoltage (Constant Voltage), sc_ss (Resistor), sen_ss (Generalized Sensor). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The companion channel RC_dyn.Vc starts at 50, ends at 25.014 and has a recorded range of 25.014 to 50 source units. Its time span matches the primary channel. Both are included to put the primary response in context. Their numerical scales may represent different physical quantities.

Reproduce the calculation
The largest absolute change between consecutive stored points appears from 0 to 0.15 seconds. Subtracting 12.5 from 12.048 gives -0.4516 A. Its location brackets the change within one saved interval of 0.15 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | sen_dyn.I (A) | RC_dyn.Vc (source units) |
|---|---|---|
0 | 12.5 | 50 |
0.15 | 12.0484 | 48.19359 |
3 | 7.644539 | 30.57816 |
6 | 6.561137 | 26.24455 |
9 | 6.319391 | 25.27756 |
12 | 6.265498 | 25.06199 |
15 | 6.253462 | 25.01385 |
What to check on site
Keep voltage, current, real power and energy distinct. Establish the reference direction at the measurement terminal before interpreting a sign change as import or export. Compare the same load boundary and duration in site data and the simulation.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.