The recorded valIsoCom.port_aChiWat.m_flow channel spans 0.001607 to 47.804 kg/s in this reference run. It starts at 0.001627 and ends at 47.804. The first recorded maximum occurs at 3,250 seconds and the first minimum at 1,150 seconds.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named ValvesIsolation. The source file places it under Templates, Plants, Heat Pumps, Components. We used the 101 stored values for valIsoCom.port_aChiWat.m_flow over the interval 0 to 5,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name valIsoCom (Valves Isolation), retChiWat (Boundary p T), retHeaWat (Boundary p T), supChiWat (Boundary p T). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel valIsoCom.port_aHeaWat.m_flow covers -0.000962 to 29.875 kg/s. At 3,250 s, the primary value is 47.804 and the companion is -0.000962. Their signed difference is 47.805 kg/s, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Isolation valve component. The simulated valIsoCom.port_aChiWat.m_flow channel runs from 0.001607 to 47.804 kg/s over 5,000 seconds.
Isolation valve component. The simulated valIsoCom.port_aChiWat.m_flow channel runs from 0.001607 to 47.804 kg/s over 5,000 seconds. Figure by Industry Applied.

Reproduce the calculation

Integrating the signed rate over 5,000 seconds gives a net 89,491 kg. This estimate averages neighbouring stored rates and multiplies by their time separation. Reverse flow reduces the net total. If a process requires gross throughput, calculate forward and reverse transfers separately at the appropriate boundary.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

valIsoCom.port_aChiWat.m_flow (kg/s)

valIsoCom.port_aHeaWat.m_flow (kg/s)

0

0.001626732

3.36101e-05

1000

0.001626732

3.36101e-05

1150

0.001606565

29.87517

2000

0.001606565

29.87517

3000

0.001606565

29.87517

3100

0.001952404

16.73884

3150

45.15456

-0.0008751585

3250

47.80371

-0.0009620887

4000

47.80371

-0.0009620887

5000

47.80371

-0.0009620887

What to check on site

Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.