The recorded zone.airModel.phi channel spans 0.4143 to 0.692 source units in this reference run. It starts at 0.692 and ends at 0.4183. The first recorded maximum occurs at 0 seconds and the first minimum at 101,520 seconds.
The system being tested
The KU Leuven IDEAS project publishes the IDEAS test named CavityInternalCeiling. The source file places it under Buildings, Components. We used the 101 stored values for zone.airModel.phi over the interval 0 to 108,000 seconds. This is a simulated test with specified inputs and boundaries.
The reference file contains 5 recorded variables. Alongside the primary output there are zone1.TSensor, zone.TSensor, zone.airModel.phi, zone1.airModel.phi, internalWall.crackOrOperableDoor.m2_flow. The source and the export are linked independently below so that each reading can be traced back to its calculated channel.
Compare the recorded channels
The companion channel zone1.airModel.phi covers 0.4068 to 0.6917 source units. At 21,600 s, the primary value is 0.5113 and the companion is 0.6059. Their signed difference is -0.09461 source units, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Reproduce the calculation
The largest absolute change between consecutive stored points appears from 9,720 to 10,800 seconds. Subtracting 0.6101 from 0.5987 gives -0.01135 source units. Its location brackets the change within one saved interval of 1,080 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | zone.airModel.phi (source units) | zone1.airModel.phi (source units) |
|---|---|---|
0 | 0.6919648 | 0.6917335 |
9720 | 0.6100827 | 0.6660365 |
10800 | 0.5987282 | 0.6610706 |
21600 | 0.5113211 | 0.6059335 |
43200 | 0.4758526 | 0.5176961 |
64800 | 0.5549352 | 0.5266379 |
86400 | 0.4556625 | 0.4556488 |
101520 | 0.4143269 | 0.4109859 |
108000 | 0.4182549 | 0.4068387 |
What to check on site
Keep the occupied schedule, weather boundary and zone definition with the result. A change in a simulated room condition can reflect the boundary assumptions as well as the component under study. Compare occupied periods and maintain the same observation location.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.
