The recorded ied.y channel spans 0 to 16.25 source units in this reference run. It starts at 0 and ends at 16.25. The first recorded maximum occurs at 10 seconds and the first minimum at 0 seconds.

The system being tested

The RWTH Aachen University E.ON Energy Research Center publishes the AixLib test named IntegralErrorDualReference. The source file places it under Utilities, KP Is. We used the 27 stored values for ied.y over the interval 0 to 10 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name ramUppBou (Ramp), ramLowBou (Ramp), pul (Pulse), booSteItgAct (Boolean Step). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel ied.yPos covers 0 to 6.75 source units. At 10 s, the primary value is 16.25 and the companion is 6.75. Their signed difference is 9.5 source units, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Integral error with dual references. The simulated ied.y channel runs from 0 to 16.25 source units over 10 seconds.
Integral error with dual references. The simulated ied.y channel runs from 0 to 16.25 source units over 10 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 0 to 0.3846 seconds. Subtracting 0 from 1.154 gives 1.154 source units. Its location brackets the change within one saved interval of 0.3846 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

ied.y (source units)

ied.yPos (source units)

0

0

0

0.3846154

1.153846

1.153846

1.923077

5.653846

3

3.846154

10.13462

5.25

6.153846

13.66346

6.538462

8.076923

15.25

6.75

10

16.25

6.75

What to check on site

Identify which part of the system the selected output represents, and retain the surrounding boundary conditions. Compare the same event and operating duty in both records. Record the equipment configuration if a later change could alter the test result.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.