The signed flow trace gives a net 150,986.3 kg over 86,400 s, using the trapezoidal rule between saved samples. The smallest and largest reported rates are 0 kg/s and 5.2808 kg/s. Check the positive flow direction in the model before using the sign to describe delivery or return.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named InjectionTwoWayCheckValve. The source file places it under Fluid, Hydronic Configurations, Active Networks. We used the 101 stored values for pum.m_flow over the interval 0 to 86,400 seconds. This is a simulated test with specified inputs and boundaries.

The reference file contains 23 recorded variables. Alongside the primary output there are T2Set.y, con.T2Sup.T, con.T2Ret.T, T1Sup.T, T1Ret.T. The source and the export are linked independently below so that each reading can be traced back to its calculated channel.

Compare the recorded channels

At 22,464 s, pum.m_flow is 3.5154 kg/s and con.pum.m_flow is 5.4668 kg/s. Subtracting the second value from the first gives -1.9513 kg/s. This is their largest recorded absolute separation. A difference between an inlet and an outlet, or between a command and a response, need not be a measurement error.

Injection two-way check valve. The simulated pum.m_flow channel runs from 0 to 5.281 kg/s over 86,400 seconds.
Injection two-way check valve. The simulated pum.m_flow channel runs from 0 to 5.281 kg/s over 86,400 seconds. Figure by Industry Applied.

Reproduce the calculation

Integrating the signed rate over 86,400 seconds gives a net 150,986 kg. This estimate averages neighbouring stored rates and multiplies by their time separation. Reverse flow reduces the net total. If a process requires gross throughput, calculate forward and reverse transfers separately at the appropriate boundary.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

pum.m_flow (kg/s)

con.pum.m_flow (kg/s)

0

0

0

17280

0

0

21600

0

0

22464

3.515439

5.466787

24192

5.280781

4.98162

34560

2.681915

2.17471

51840

1.178864

0.651265

69120

3.153897

2.691749

86400

0

0

What to check on site

Mark the measurement points on a hydraulic schematic and identify whether the controller holds flow or differential pressure. Record pump command and delivered duty together. A site comparison needs the same branch state, including bypasses and closed valves.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.