The embeddedPipe.dp trace ranges from -7.52e-06 Pa to 143,442.5 Pa across 101 saved checkpoints. It begins at 0 Pa and finishes at 19,671.2 Pa after 10,000 s of test time. The source identifies the channel scale as Pa. Its first saved maximum occurs at 100 s.

The system being tested

The KU Leuven IDEAS project publishes the IDEAS test named EmbeddedPipeDp. The source file places it under Fluid, Heat Exchangers. We used the 101 stored values for embeddedPipe.dp over the interval 0 to 10,000 seconds. This is a simulated test with specified inputs and boundaries.

The reference file contains 1 recorded variables. The source and the export are linked independently below so that each reading can be traced back to its calculated channel.

Compare the recorded channels

The primary channel spends 1.0% of its saved checkpoints at or above 71,721 Pa, halfway between the observed minimum and maximum. Its time-weighted mean under piecewise-linear interpolation is 13,829 Pa. These two numbers distinguish how much of the run is spent high from the absolute value of its peak.

Ing pressure drop of embeddedpipe. The simulated embeddedPipe.dp channel runs from -7.52e-06 to 143,443 Pa over 10,000 seconds.
Ing pressure drop of embeddedpipe. The simulated embeddedPipe.dp channel runs from -7.52e-06 to 143,443 Pa over 10,000 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 0 to 100 seconds. Subtracting 0 from 143,443 gives 143,443 Pa. Its location brackets the change within one saved interval of 100 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

embeddedPipe.dp (Pa)

0

0

100

143442.5

2000

19671.16

4000

2.274408

6000

5.077622e-05

7200

-7.519629e-06

8000

19667.44

10000

19671.15

What to check on site

Record the hot and cold boundary conditions as well as the response inside the component. For a steady comparison, check that stored heat has stopped changing. For a transient comparison, keep the timing and the observation location with every reported value.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.