The archived con.y output switches 7 times between consecutive checkpoints. Its first change, from 1 to 0, falls between 6,048 s and 6,912 s. The exact switching instant can fall anywhere inside that saved interval.
The system being tested
The KU Leuven IDEAS project publishes the IDEAS test named HysteresisRelease_Cooling. The source file places it under Controls, Discrete. We used the 101 stored values for con.y over the interval 0 to 86,400 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name uHigh (Ramp), uHigh1 (Ramp). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
At 6,912 s, con.y reads 0 and con.uLow reads 274.015. Across the run, the second channel ranges from 265 to 275. Compare the timing of changes on the two traces. A numerical difference between these channels has no demonstrated physical meaning without matching quantity definitions and units.

Reproduce the calculation
The largest absolute change between consecutive stored points appears from 6,048 to 6,912 seconds. Subtracting 1 from 0 gives -1 source units. Its location brackets the change within one saved interval of 864 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | con.y (source units) | con.uLow (source units) |
|---|---|---|
0 | 1 | 275 |
6048 | 1 | 274.1587 |
6912 | 0 | 274.0147 |
17280 | 0 | 272.2867 |
34560 | 0 | 269.4067 |
51840 | 0 | 266.5267 |
69120 | 0 | 265 |
86400 | 0 | 265 |
What to check on site
Record each condition, calculated request and issued output as separate tags. Keep timestamps and the sample or event rule with the export. A stable displayed value may be held by logic after the measured input has changed.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.