The signed flow trace gives a net 29,726.8 kg over 2,000 s, using the trapezoidal rule between saved samples. The smallest and largest reported rates are 0 kg/s and 60.203 kg/s. Check the positive flow direction in the model before using the sign to describe delivery or return.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named ChillersToPrimaryPumpsSeries. The source file places it under Templates, Plants, Chillers, Components. We used the 101 stored values for mChiWatEco_flow.m_flow over the interval 0 to 2,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name yPumChiWatPri (Constant), rou1 (Chillers To Primary Pumps), outPumChiWatPri1 (Multiple To Single), pumChiWatPri1 (Multiple). The source declares nChi = 3, tau = 10. These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

At 1,040 s, mChiWatEco_flow.m_flow is 6.0124 kg/s and mChiWatPri_flow2.m_flow is 60.996 kg/s. Subtracting the second value from the first gives -54.984 kg/s. This is their largest recorded absolute separation. A difference between an inlet and an outlet, or between a command and a response, need not be a measurement error.

Hydronic interface between series chillers and primary pumps. The simulated mChiWatEco_flow.m_flow channel runs from 0 to 60.203 kg/s over 2,000 seconds.
Hydronic interface between series chillers and primary pumps. The simulated mChiWatEco_flow.m_flow channel runs from 0 to 60.203 kg/s over 2,000 seconds. Figure by Industry Applied.

Reproduce the calculation

Integrating the signed rate over 2,000 seconds gives a net 29,727 kg. This estimate averages neighbouring stored rates and multiplies by their time separation. Reverse flow reduces the net total. If a process requires gross throughput, calculate forward and reverse transfers separately at the appropriate boundary.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

mChiWatEco_flow.m_flow (kg/s)

mChiWatPri_flow2.m_flow (kg/s)

0

0

0

400

0

0

800

0

0

1200

6.01242

60.99635

1540

23.99587

60.88121

1560

34.19798

60.7557

1600

49.95535

60.45885

1640

60.20282

60.20383

2000

60.20282

60.20383

What to check on site

Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.