Take half the product of the peak excess discharge and a 90-minute base duration expressed in seconds. At 2 on the peak discharge above background (m³/s) scale, the worked result is 5,400 on the excess volume in a 90-minute pulse (m³) scale. The figure and table let you check the result against a second operating point.
Set up the field measurement
Subtract base flow before integrating the event. For observed hydrographs, sum trapezoids between real timestamps instead of forcing a triangular shape. Keep the reference observation alongside the calculation, with the instrument identification, observation period and units. This makes it possible for the next shift to distinguish a new operating condition from a change in how the observation was recorded.
Two operating points
Compare the two adjacent inputs of 1 and 2 m³/s. The calculation gives 2,700 at the first and 5,400 at the second. The signed change is 2,700 on the output scale. A spreadsheet cross-check should reproduce both rows and the direction of change before it is copied through the remaining conditions.

Worked data
Peak discharge above background (m³/s) | Excess volume in a 90-minute pulse (m³) |
|---|---|
0.2 | 540 |
0.5 | 1350 |
1 | 2700 |
2 | 5400 |
4 | 10800 |
6 | 16200 |
Checking the working range
At the two ends of the example, an input of 0.2 gives 540 and an input of 6 gives 16,200. Use a value near each end to check your implementation. Testing only the middle row can conceal an incorrect offset, an inverted ratio or a unit conversion applied twice.
Interpreting the result
A logger that misses the crest can depress the volume estimate. Retain raw time intervals and distinguish a missing interval from a real flat hydrograph. If measured performance sits outside the worked range, first repeat the comparison using field inputs and the same boundary. Preserve the original reading in the export. A discrepancy is easier to investigate when the field observation and the calculated output occupy separate columns.
Source and calculation data
For the underlying measurement context, see the USGS guide to collecting streamflow data. The operating values and sensitivity analysis here are an Industry Applied worked example. Download the input and output values to verify the calculation with the values from your own site.