Divide the 36 mm readily available reserve by daily crop water use. In the worked example, Daily crop water use of 5 mm/day gives time to use the reserve of 7.2 days.

Set up the field measurement

Read soil pits across contrasting soil areas and check when the active root depth changes. A probe in a shallow patch can reach its refill point while a deeper part of the block still has water. Keep the reference observation alongside the calculation, with the instrument identification, observation period and units. This makes it possible for the next shift to distinguish a new operating condition from a change in how the observation was recorded.

Two operating points

At 4 mm/day the calculated time to use the reserve is 9 days. At 5 mm/day it is 7.2 days. Subtracting the first output from the second gives -1.8 days. These values give two independent checkpoints for a spreadsheet or a logger conversion.

Time to use the reserve (days) plotted against daily crop water use (mm/day). Across the example the output changes from 18 to 4.5.
Time to use the reserve (days) plotted against daily crop water use (mm/day). Across the example the output changes from 18 to 4.5. Figure by Industry Applied.

Worked data

Daily crop water use (mm/day)

Time to use the reserve (days)

2

18

3

12

4

9

5

7.2

6

6

8

4.5

Checking the working range

At the two ends of the example, an input of 2 gives 18 and an input of 8 gives 4.5. Use a value near each end to check your implementation. Testing only the middle row can conceal an incorrect offset, an inverted ratio or a unit conversion applied twice.

Interpreting the result

The calculation assumes no effective rain and no irrigation during the interval. A very hot afternoon can change the daily balance before the next scheduled check. If measured performance sits outside the worked range, first repeat the comparison using field inputs and the same boundary. Preserve the original reading in the export. A discrepancy is easier to investigate when the field observation and the calculated output occupy separate columns.

Source and calculation data

For the underlying measurement context, see Agriculture Victoria’s guide to readily available water. The operating values and sensitivity analysis here are an Industry Applied worked example. Download the input and output values to verify the calculation with the values from your own site.