Scale 36 mm of profile reserve by wetted width divided by 5 m row spacing. In the worked example, Wetted strip width of 2 m gives accessible reserve across orchard area of 14.4 mm.

Set up the field measurement

After irrigation, inspect the wetting pattern at more than one depth. A broad patch on the surface may narrow rapidly below the emitters. Keep the reference observation alongside the calculation, with the instrument identification, observation period and units. This makes it possible for the next shift to distinguish a new operating condition from a change in how the observation was recorded.

Two operating points

At 1.5 m the calculated accessible reserve across orchard area is 10.8 mm. At 2 m it is 14.4 mm. Subtracting the first output from the second gives 3.6 mm. These values give two independent checkpoints for a spreadsheet or a logger conversion.

Accessible reserve across orchard area (mm) plotted against wetted strip width (m). Across the example the output changes from 3.6 to 21.6.
Accessible reserve across orchard area (mm) plotted against wetted strip width (m). Across the example the output changes from 3.6 to 21.6. Figure by Industry Applied.

Worked data

Wetted strip width (m)

Accessible reserve across orchard area (mm)

0.5

3.6

1

7.2

1.5

10.8

2

14.4

2.5

18

3

21.6

Checking the working range

At the two ends of the example, an input of 0.5 gives 3.6 and an input of 3 gives 21.6. Use a value near each end to check your implementation. Testing only the middle row can conceal an incorrect offset, an inverted ratio or a unit conversion applied twice.

Interpreting the result

The worked strip is continuous and non-overlapping. Widely spaced isolated bulbs need an area estimate that reflects their actual shape. If measured performance sits outside the worked range, first repeat the comparison using field inputs and the same boundary. Preserve the original reading in the export. A discrepancy is easier to investigate when the field observation and the calculated output occupy separate columns.

Source and calculation data

For the underlying measurement context, see Agriculture Victoria’s guide to readily available water. The operating values and sensitivity analysis here are an Industry Applied worked example. Download the input and output values to verify the calculation with the values from your own site.