Add bank subsection contributions of 0.18 and 0.12 cubic metres per second to the centre section's 1.4 m width times 0.6 m mean depth times velocity. In the worked example, Velocity in the centre subsection of 0.5 m/s gives total estimated stream discharge of 0.72 m³/s.
Set up the field measurement
Record each observation at the same cross section. Add signed contributions if a local recirculation cell reverses the measured direction. Keep the reference observation alongside the calculation, with the instrument identification, observation period and units. This makes it possible for the next shift to distinguish a new operating condition from a change in how the observation was recorded.
Two operating points
At 0.35 m/s the calculated total estimated stream discharge is 0.594 m³/s. At 0.5 m/s it is 0.72 m³/s. Subtracting the first output from the second gives 0.126 m³/s. These values give two independent checkpoints for a spreadsheet or a logger conversion.

Worked data
Velocity in the centre subsection (m/s) | Total estimated stream discharge (m³/s) |
|---|---|
0.1 | 0.384 |
0.2 | 0.468 |
0.35 | 0.594 |
0.5 | 0.72 |
0.7 | 0.888 |
0.9 | 1.056 |
Checking the working range
At the two ends of the example, an input of 0.1 gives 0.384 and an input of 0.9 gives 1.056. Use a value near each end to check your implementation. Testing only the middle row can conceal an incorrect offset, an inverted ratio or a unit conversion applied twice.
Interpreting the result
Banks and bed geometry move after high flow. Document the measurement date and re-survey the cross section when conditions change. If measured performance sits outside the worked range, first repeat the comparison using field inputs and the same boundary. Preserve the original reading in the export. A discrepancy is easier to investigate when the field observation and the calculated output occupy separate columns.
Source and calculation data
For the underlying measurement context, see the USGS guide to collecting streamflow data. The operating values and sensitivity analysis here are an Industry Applied worked example. Download the input and output values to verify the calculation with the values from your own site.