The saved con.y signal is high at 78 of 101 checkpoints and changes state between adjacent checkpoints 3 times. The first recorded change is from 0 at 2,592 s to 1 at 3,456 s.
What the reference test measures
The IDEAS model named HysteresisRelease_Heating comes from the KU Leuven IDEAS project. The saved result covers simulation time 0 to 86,400 seconds. Industry Applied extracted 101 checkpoints for con.y and kept the original signed values. The regular output spacing is 864 seconds. The solver may take different internal steps.
The model definition identifies uHigh (Ramp), uHigh1 (Ramp). These component names let a reader trace the plotted tags to their owning blocks before reproducing the result.
Settings to preserve when repeating the experiment
The published test declares uHigh.startTime = 1000, uHigh.duration = 60000, uHigh.offset = 315. Those numbers use the units and component definitions in the linked model. Start with the declared configuration when reproducing the reference result, then vary one setting at a time. Changing the input waveform and the component response in the same comparison makes it difficult to identify the source of a difference.
Reading the two channels
The companion channel con.u spans 294.696 to 313.15 input units across its 101 stored values. The primary trace first reaches its recorded maximum at 3,456 seconds and its minimum at 0 seconds. A time-aligned comparison preserves the meaning and units of each channel.

Reproducing the largest recorded change
Between the stored points at 2,592 and 3,456 seconds, con.y changes from 0 to 1. Subtracting the earlier reading gives +1 source signal units. This interval contains the largest absolute point-to-point change in the saved primary channel. A faster excursion followed by recovery could fit entirely between the two records.
State changes are bracketed by saved output times. Counting high samples is not a pulse-width measurement. A brief transition between output points can be invisible in the saved Boolean trace.
Worked data
Simulation time (s) | con.y (signal units) | con.u (input units) |
|---|---|---|
0 | 0 | 313.15 |
2592 | 0 | 310.1252 |
3456 | 1 | 309.3851 |
21600 | 1 | 302.7161 |
43200 | 1 | 305.7343 |
64800 | 0 | 300.4777 |
86400 | 1 | 294.6957 |
Applying the result to an operating site
A released heating request is distinct from a falling measured temperature. Trace the demand thresholds alongside the controller output. Distinguish the room sensor, release flag and final plant enable before explaining a short cycle.
For an Australian monitoring project, write the intended sample interval, timestamp convention, tag units and missed-update policy into the acceptance record. Re-run this comparison on the installed signal path and retain the raw export so a later dashboard change can be checked against the same baseline.