The senTChiWatRet.T trace covers 6.975 to 20 °C, a temperature span of 13.025 K. The first recorded maximum occurs at 6,500,000 seconds. The numerical source and data table retain the original kelvin values. Subtract 273.15 only when converting an absolute temperature to Celsius.

The system being tested

Lawrence Berkeley National Laboratory publishes the Buildings test named HeatRecoveryHeatPump. The source file places it under DHC, ETS, Combined. We used the 101 stored values for senTChiWatRet.T over the interval 6,500,000 to 7,000,000 seconds. This is a simulated test with specified inputs and boundaries.

The component declarations name THeaWatSupSet (Constant), TChiWatSupSet (Constant), senTHeaWatSup (Temperature Two Port), senTChiWatSup (Temperature Two Port). The source declares dTChiWat_nominal = 5, dTHeaWat_nominal = 10. These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.

Compare the recorded channels

The companion channel senTChiWatSup.T covers 276.977 to 293.15 K. At 6,700,000 s, the primary value is 281.263 and the companion is 277.071. Their signed difference is 4.191 K, the largest absolute separation on the common grid. Check the two channels’ physical roles before interpreting that difference as any kind of error.

Ets model with heat recovery heat pump. The simulated senTChiWatRet.T channel runs from 280.125 to 293.15 K over 500,000 seconds.
Ets model with heat recovery heat pump. The simulated senTChiWatRet.T channel runs from 280.125 to 293.15 K over 500,000 seconds. Figure by Industry Applied.

Reproduce the calculation

The largest absolute change between consecutive stored points appears from 6,505,000 to 6,510,000 seconds. Subtracting 289.236 from 281.388 gives -7.847 K. Its location brackets the change within one saved interval of 5,000 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.

The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.

Worked data

Simulation time (s)

senTChiWatRet.T (K)

senTChiWatSup.T (K)

6500000

293.15

293.15

6505000

289.2358

289.1798

6510000

281.3884

278.5646

6555000

280.125

277.1663

6600000

280.2892

277.5936

6700000

281.2626

277.0715

6800000

281.0226

278.6328

6900000

280.8082

278.2883

7000000

280.5755

277.5141

What to check on site

Read the evaporator, condenser and electrical channels at the same duty. The water or air temperatures entering the equipment constrain capacity and efficiency. A compressor command does not specify how much heat actually crosses the useful-load boundary.

State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.

Data and source model

Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.