The archived freProSta1.y output switches 1 time between consecutive checkpoints. Its first change, from 0 to 1, falls between 900 s and 918 s. The exact switching instant can fall anywhere inside that saved interval.
The system being tested
Lawrence Berkeley National Laboratory publishes the Buildings test named Enable_FreProSta. The source file places it under Controls, OBC, ASHRAE, G36, AH Us, Multi Zone, variable air volume, Economizers, Subsequences. We used the 101 stored values for freProSta1.y over the interval 0 to 1,800 seconds. This is a simulated test with specified inputs and boundaries.
The component declarations name enaDis (Enable), TOutBelowCutoff (Constant), TOutCut (Constant), hOutBelowCutoff (Constant). These identifiers can be found in the linked model definition. Check how they connect to the plotted quantity before comparing it with a field meter or a differently named controller tag.
Compare the recorded channels
The primary channel spends 49.5% of its saved checkpoints at or above 0.5 source units, halfway between the observed minimum and maximum. Its time-weighted mean under piecewise-linear interpolation is 0.495 source units. These two numbers distinguish how much of the run is spent high from the absolute value of its peak.

Reproduce the calculation
The largest absolute change between consecutive stored points appears from 900 to 918 seconds. Subtracting 0 from 1 gives 1 source units. Its location brackets the change within one saved interval of 18 seconds. It does not identify an unobserved instantaneous peak or the exact crossing time.
The worked table retains the first and last points, the primary maximum and minimum, the largest adjacent change and a spread of checkpoints across the run. Rounding is for presentation. Use the full linked reference series to repeat integrals or compare events between checkpoints. The archived sampling interval need not match the simulation solver’s internal step.
Worked data
Simulation time (s) | freProSta1.y (integer) |
|---|---|
0 | 0 |
360 | 0 |
720 | 0 |
900 | 0 |
918 | 1 |
1080 | 1 |
1440 | 1 |
1800 | 1 |
What to check on site
Separate a calculated setpoint from the damper or fan command and from the measured service delivered. Trend the active operating mode, request, actual flow and zone condition on one clock. A sequence can change state correctly while the terminal fails to reach duty.
State the operating duty, measurement location and expected tolerance before evaluating a local trend. Re-run the comparison with the installed controls and instruments during a representative operating period. Retain the native units and the raw export so that a later change in software or presentation can be investigated.
Units in the source model
The component declarations identify the scale of the exported variables. In this run, freProSta1.y uses integer or state code. Keep the exact channel name and unit together when exporting data to a historian. Read the component definition.
Data and source model
Published model and component definitions. Numerical reference series. Simulation and plot commands. Download the worked checkpoints in CSV format.


